top of page
Architects Planning

Introducing STEVE General Contractor

Home: Welcome

Who We Are

Committed to Excellence

STEVE General Contractor is a leading and reputable Construction Company serving the Western New York area. We’ve taken a comprehensive approach to project management, and on-site productivity.

Screenshot_20210304-110203 2.png
Home: About
Screenshot_20210406-191133.png

David Vasciannie

Chief Executive Officer, President

Since 1983

William Vasciannie

General Superintendent

Since 1977

croped picture.jpg
IMG_20190719_144237960.jpg

Charles Vasciannie

Retired 2021

Since 1978

Richard Vasciannie

Retired 2020

41 years

Screenshot_20210406-111921.png
Screenshot_20210406-111921.png

Steve Vasciannie Jr.

Retired 2016

45 years

Tracy McVicker

Office Manager/Project Manager

Since 2001

20210715_140513.jpg
Desk Computer

Ann Gattie

Administrative Assistant/Clerk

Since 2007

Kirk Thomas

Courier, etc.

.

Screenshot_20210406-111921.png
Screenshot_20210406-111921.png

General Foremen

Greg Thomas                      

Tim Thomas                         

Sharif Vasciannie

Kevin Converse

Dustin Converse

Eric Schultz 

Guy Lowery

Dwight Dieter Jr. 

Garrett Northup

John Bater

Cody Rivera

Variety of experience

Project Managers

Charles Brown

 Kevin Wu 

.

Screenshot_20210406-111921.png
Home: Meet the Team

Our Background

Founded[1973] by Steve Vasciannie Sr. (1922 - 2004)

At STEVE General Contractor, we take great pride in our excellent workmanship and the ability to deliver outstanding results. Since our founding, we’ve worked hard toward building and maintaining a stellar reputation as a leading Construction Company. We provide owners with a wide range of services to cover all their needs.

download.jpg
Home: About Us

Projects

Examples of Our Work

IMG_20190527_174236720.jpg

FREDERICK DOUGLASS - 
GREATER ROCHESTER INTERNATIONAL AIRPORT

2019

Extensive upgrades throughout the Terminal

See linked article in previous "OUR BACKROUND" section

IMG_20210218_101729979_HDR.jpg

RCSD - #22 (6) Modernization

6/2018 - 12/2019

2 Additions (North and South); Complete interior renovations; Site Improvements - including parking lot, playground, sidewalks and underground drainage/grading; Full roofing replacement

IMG_20201223_085129718.jpg

RCSD - EAST HIGH STADIUM GRANDSTAND

c.2000s

Elaborate structure of concrete, brick and metals; inclusive of a Press Box and bleachers

IMG_20210306_110809246_HDR.jpg

RCSD - EDISON TECH Modernisation 

2019 - 2020

Renovations and replacements of Driveways, parking and walks; Roofing; Windows and Exterior Doors; Repainting of entire building exterior; concrete retaining walls repairs

IMG_20210310_083701711 1.jpg

YORK CSD    BUILDING ADDITIONS

2000 - 2001

SE - New TECH/SHOP building, 3 story addition and Press Box

[N - 2nd Floor classrooms add-on; Music Dept. addition]

{Steve Jr., Richard, William, Charles, David, 2 Sisters, Mother and Tracy(and her sisters) are all graduates of YCSD}

Untitled

R.I.T. Entrance Sign and surrounding structures

c.2000s

Futuristic build of concrete, brick and metal panels cladding

IMG_20210210_114006275.jpg

FREDERICK DOUGLASS - 
G.R.I.A. Roadway Signs

1991 [Steve Sr.]

Roadway directional signs (overhead & roadside) entering and exiting the Rochester Airport Terminal complex (concrete bases, painted steel structures and signage)

IMG_20210205_114534963_HDR_edited.jpg

GENESEE COUNTY BUILDING and adjacent OLD COURTHOUSE Renovations

1998-1999

Addition (elevator, stairwell and corridors); entire interiors renovations and main entrances stairs replacements

IMG_1651.jpg

GREECE ATHENA AUDITORIUM

2016

Total rehab, including seating heights adjustments in the balcony and lower level

IMG_20201229_125301593_HDR.jpg

MONROE COMMUNITY HOSPITAL Windows Replacements

1988

Windows replacements of entire building (w/AJAY GLASS)

IMG_20210225_101021557.jpg

MUMFORD Fire Department

c.2000s

Building Additions

IMG_20201223_090031208_HDR.jpg

RCSD - EAST HIGH SCHOOL Windows & Exterior Doors Replacements

2014

Removals and Temporary Protection of entire building.

Screenshot_20210330-095013.png

ICE RINK and LODGES @ Martin Luther King Jr ParkPARK

2000s

Concrete pool basin/edge, surrounding walks and Lodge renovation

IMG_20230705_102137683_HDR.jpg

NYS THRUWAY RESTSTOPS

2023

Drywall, Acoustical; Interior doors

IMG_20210312_154213148_HDR.jpg

GCC ART GALLERY ADDITION

2010

Full addition to theatre/arts wing

IMG_20221229_134904344_HDR.jpg

BROCKPORT COLLEGE
SEYMOUR UNION BALLROOM

2022

Ballroom, adjacent toilet rooms, etc. renovations(GC, MEP)

IMG_20210325_113510255_HDR.jpg

WALGREENS Masonry
(E Henrietta)

c.2010s

Brick, block and precast

Folder001_00033A.jpg

BATAVIA DOWNS Cooling Tower addition and interior upgrades

2003

Part of Grandstand, previous - exterior entrance and other interior upgrades [prior to current reconstruction for gaming]

IMG_20140311_145351_215 (2).jpg

RALPH WILSON/BILLS STADIUM

2014

Concrete, sub-base trenching and
replacement for concessions and toilet rooms underground plumbing - throughout entire stadium

EFFECTS.jpg

RCSD - FRANKLIN HIGH

1990s thru 2020s

Sidewalks, Masonry Sign, Flagpole;Windows Replacements of entire building;Interior hallway ceilings, toilet rooms, etc.

Untitled

HIGHLAND PARK SIGNS

2003

{1 OF 6} @ various park entrances

IMG_20210117_153548645.jpg

ELBA CSD - Exterior Entrance Replacements

2011

Concrete stairs, ramps, walks and faux brick patterned walls; brick veneer and metal railings

IMG_20210327_131821550_HDR.jpg

CHURCHVILLE-CHILI ES

2017

New handicap ramp, stairs and walks - inclusive of new windows(entire building), elevator, offices, classrooms and gymnasium renovations project

IMG_20160524_131759121_HDR 1.jpg

911-EMERGENCY COMMUNICATIONS FACILITY

2016

Upgrades to Primary and Secondary Operations, offices, foyer, lobby, etc.

IMG_20210326_100531327_HDR.jpg

The Insurance Center (Batavia,NY)
MASONRY FACADE

2010s

Exterior brick and stone.....

IMG_20131226_114100_238.jpg

GATES-CHILI HS Aquariums

2014

New intricate solid concrete structure, w/ceramic tiles (replaced deteriorating metal stud and MR drywall)

IMG_20221023_131630091 Copy.jpg

Hilton, NY Community Center

1997

Elevator and machine room addition and handicap ramp matching existing building

IMG_20210224_123152967.jpg

PAVILION CSD

2016

2 stories windows replacements of the original building

IMG_20210310_131118736_HDR.jpg

PAVILION CSD New Corridor Addition

2018

Connecting corridor from main building to renovated Shops; including Main Offices and Toilet Rooms renovations

IMG_20210303_110142115.jpg

LAKE RILEY LODGE @ Cobbs Hill Park

c.1990s

Renovations prior to former Rochester Mayor Bill Johnsons' inauguration dinner

IMG_20210228_153549794_HDR.jpg

Pembroke Town/Corfu Village Court

2002

New courtroom; new entrances

IMG_20221023_140220915.jpg

GREECE OLYMPIA {ARCADIA} HIGH SCHOOL

2014 [2013]

Window replacements - entire building {50%@ARCADIA]
[Classrooms, offices, hallways - total gut and renovate]

IMG_20210227_122349637 (2).jpg

MCC Main Entrance ELEVATOR

c.1990s

Created new elevator at previous stacked office space. Part of handicap accessible toilet rooms and lecture halls project

IMG_20210309_121736954 1.jpg

AVON CSD Pool Building

2015

Total removals and rebuild of the pool, deck, bleachers; including "raising the roof". [New Concession Stand built into west side of existing building]

IMG_20210721_111107062_HDR.jpg

BUCKMAN-Brighton-PARK

c.2000s

Concession Stand/Toilet Facility

IMG_20201107_104135740.jpg

GENESEO Water Filtration Plant @ Conesus Lake (NW)

c.1980s

Stone face block and brick {Steve Sr.}

Screenshot_20210402-090748.png

CANALSIDE - Buffalo

2013

Installed wood decking @ the pedestrian bridges; delivered/staged granite from offsite storage (installed throughout by others)

IMG_20210503_101336643_HDR.jpg

RCSD Franklin High Stadium

c.1990s

Turf, synthetic track, bleachers, press box

IMG_20210407_074408218_HDR 1.jpg

BATAVIA DOWNS Food Services

2019

3 additions along the racetrack

IMG_20210224_101533936_HDR.jpg

BRIGHTON CSD

2021

HS Main Sign
Inclusive of extensive interior renovations of the HS and MS

20201113_142148.jpg

BRIGHTON HS AUDITORIUM

2021

Updated original Auditorium

IMG_20201229_151856799_HDR.jpg

Jefferson Ave. Seventh Day Adventist Church [Steve Sr.] ( Demolished 2022 following fire)

c.1980s

(N) Addition/stairs/ramp; Classrooms, Sanctuary renovations

IMG_20210224_110605206 (2).jpg

SUNY GENESEO Entrance Signs

c.2000s

Inclusive of many projects on campus for 40+ years

Franklin 041.JPG

RCSD FRANKLIN HIGH AUDITORIUM

2009

Total renovation

IMG_20210222_100024299_HDR.jpg

WHEATLAND CHILI CSD

c.2000s

Transportation Building Additions (N&W)

IMG_20210425_145059729_HDR.jpg

Windows Replacements @ V.A. Hospital in Canandaigua, NY

c.1980s

Remove and replace 3 buildings

IMG_20210219_091157233_HDR.jpg

NYS VETERANS HOME - Batavia, NY

2004; 2005

4 Bedroom Additions N,S,E&W
2 Dining Room Additions S,E&W
[prior to recent exterior facelift]

IMG_20210219_090723826 (2).jpg

VA HOSPITAL Elevator - Batavia, NY

c.1990s

Elevator addition/Handicap entrance

IMG_20210306_115042925 1.jpg

LODGE @ Martin Luther King Jr. Memorial Park

c.2000s

Subterranean facility recreated from abandonded exposed concrete areas

IMG_20210225_095155001.jpg

MCWA Pump Houses

c.1990s

Chili (and Scottsville), NY

Screenshot_20210222-173821.png

RCSD TRANSPORTATION (Hudson Avenue

c.2000s

New - Vehicle Maintenance Building

IMG_20210224_120039474.jpg

GENESEO Wastewater Treatment Plant

2003

New Inlet/Digester Building

IMG_20210218_103418541.jpg

RCSD FRANKLIN HIGH

c.2010s

Loading Dock Addition w/elevator

IMG_20210204_075921849.jpg

KENDALL CSD

2020

Field Toilet Facility. Inclusive of CIP renovations of the HS and ES

IMG_20221006_095238024_HDR Copy.jpg

RCSD #39

2022

New brick walls, concrete sidewalks and handicap ramp, granite and precast steps and entrance landing, railings. Inclusive of interior doors replacements; Gymnatorium renovations

IMG_20150928_130906518.jpg

GREECE(NY) ARCADIA Auditorium

2015

Total renovations

IMG_20210302_121456069_HDR.jpg

WARSAW CSD Administration Building

2020

Exterior upgrades and created new offices, etc. from abandonded shop. Inclusive of a 2 year CIP renovations @ the HS and ES

IMG_20210219_090541084.jpg

VA HOSPITAL(Batavia, NY) Loading Dock

c.1980s

Addition [Steve Sr.]

IMG_20210224_114506720_HDR (2).jpg

MT. MORRIS(,NY) Wastewater Treatment
Plant

c.2010s

New building and 1 small addition

IMG_20210219_092228732_HDR.jpg

BATAVIA(,NY) Water Treatment Plant

c.2000s

Exterior masonry restorations; Interior masonry and concrete repairs

IMG_20160225_094244403_HDR.jpg

PENN YANN(,NY) WWTP

2016

2 New storage buildings on existing foundations, new concrete floor slabs

IMG_20210302_073523021_HDR.jpg

SUNY BROCKPORT - 4 High rise Dormitories

c.2000s

Windows replacements [assisted Flower City Glass] -  PREVIOUS YEARS PROJECTS: Elevator modifications - created new doors to allow 2(3) elevators to stop at each floor{previously alternating}(c.1990s); Dryer vents; Fire alarm upgrades(c.1990s)[Steve Sr.]; Toilet Rooms renovations throughout entire campus(2006); SUBWAY @ Student Union; etc.

IMG_20210302_075105173_HDR.jpg

BROCKPORT(,NY) MIDDLE SCHOOL

c.2010s; 2000s

Auditorium interior upgrades;
Exterior masonry restorations - brick, steel lintels(w/brick) replacements

IMG_20221006_092220988_HDR.jpg

cds housing @ Joseph Ave./Clifford Ave./Maria St.

2022

Doors, millwork-cabinets, counters, trims

IMG_20210227_122918107_HDR.jpg

MCC DORMS - Interiors

c.2000s

Installed doors; cabinetry, trims

IMG_20210302_074427022_HDR.jpg

SUNY BROCKPORT Eagle Hall Dorms - INTERIOR

2018

Doors, frames & hardware; cabinets; solid surface sinks, countertops, window sills

IMG_20210311_120125126_HDR.jpg

AVON(,NY) WESLEYAN CHURCH Addition SE

c.1970s

Large 1st floor and basement addition [Steve Sr. prior to incorporation]

Home: Projects
Home: Pro Gallery
IMG_20210408_160438791.jpg

Steve Vasciannie Sr. (1922 - 2004)  - FOUNDER

  • Google Places
Home: Contact
bottom of page